MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Marcos inspects rock shed project in Benguet
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://052298.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.

Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
- Escudero urges list of unfundable projects for 2026 budget
- Marcos to mark ‘Thrilla In Manila’ 50th anniversary
- DSWD allocates P6.2B for livelihood program
- Surfacing of WPS features ‘likely’ natural occurrence, not due to dumped crushed corals
- Sara Duterte calls DPWH flood control Inquiry a 'Zarzuela'
- 25 countries suspend postal services to US over tariffs – UN
- DPWH to revisit budget, to complete revisions within 2 weeks
- VP Sara lauds Filipino heroes
- Malacañang calls plot to jail VP Duterte 'wild imagination'
- Chinese bridge collapse kills at least 12 construction workers